Cargo: A technical equipment line for reinforced concrete structures production at the Weckenmann Anlagentechnik GmbH & Co.
Decision:
The transportation was carried out within 8 months (from February to October 2013). The vehicle delivery schedule, developed by specialists, corresponded with the manufacturing time at the plant. Obtainment of classification decisionswas needed. Overall, 117 vehicles were used, 55 of which complied with dimensionallimits, and 62 exceeded them.
Transportation type: |
over-sized cargo transportation project transportation |
---|---|
Industry: | construction |